J
JASMINE A Solid and reliable. Works great.
- 5 stars: 1 (100%)
- 4 stars: 0 (0%)
- 3 stars: 0 (0%)
- 2 stars: 0 (0%)
- 1 star: 0 (0%)
J
JASMINE A Solid and reliable. Works great.
Train smarter and explore further with our Waterproof Dog Training Leash. Made from DuraSoft flex poly coated nylon, this long lead is built to handle the toughest outdoor conditions — water, sand, mud, and more — without getting soggy, sticky, or smelly. Available in 10ft, 20ft, 30ft, and 50ft lengths, it’s the go-to recall and freedom leash for dogs of all sizes who love the outdoors.
| Feature | Details |
|---|---|
| Material | DuraSoft Flex Poly Coated Nylon |
| Width | 1/2 inch |
| Available Lengths | 10ft / 20ft / 30ft / 50ft |
| Tensile Strength | 600–750 lbs Pull Force |
| Water Resistance | Waterproof / Quick-Dry |
| Tangle Resistance | High – Knot-Resistant Material |
| Compatible Dog Sizes | Small, Medium, Large |
| Best For | Recall Training, Hiking, Beach, Camping, Yard, Swimming |
Q: What length should I choose for recall training?
A: The 30ft leash is the most popular for recall training in open spaces. The 50ft option provides maximum freedom for beach, open fields, and advanced training. Start with 10ft or 20ft for smaller yards or beginning training.
Q: Is this leash really waterproof?
A: Yes — the poly coated nylon is waterproof and won’t absorb water the way fabric or standard nylon leashes do. It dries fast and sand doesn’t stick to it, making it ideal for beach and water use.
Q: Can this leash handle a large, strong dog?
A: Absolutely. The leash is rated for 600–750 lbs of pull force, making it suitable for even the largest and strongest breeds.
Q: Will the leash tangle or knot during use?
A: The DuraSoft poly coated material is specifically designed to resist knotting and tangling — even when dragged through water or around other dogs’ feet.
Q: Is this a good gift for a dog owner?
A: Absolutely — especially for active owners who hike, camp, or spend time at the beach with their dogs. A premium waterproof long line is a gift they’ll use constantly.
Q: How do I clean this leash?
A: Simply rinse with water and wipe down with a cloth. The coating prevents dirt and sand from sticking, so cleanup is quick and easy.
Ships from US warehouse, free delivery 2-7 business days.